Showing posts with label Workshops and Workparties. Show all posts
Showing posts with label Workshops and Workparties. Show all posts

Thursday, February 25, 2010

High School Students Plaster the Oven




We had a great group of high school student from Marin Academy spend a day at Villa Sobrante last Sunday. After showing them around, we made pizza in the wood fired cob oven, then plastered the oven with an earthen plaster. I have never had a such an enthusiastic group of teenagers. It was fantastic. It was day one for them of five days of hands on permaculture, after here they headed out to RDI. How wonderful it would be if every teenager had the opportunity to do that, and if even a small percentage wanted to.

Saturday, December 19, 2009

Introduction to Natural Plasters and Paints Workshop

Where: Here at the Villa, El Sobrante, CA (10 minutes north of Berkeley)

When: Feb. 6th & 7th

Cost: $150 per person

$250 for two people signing up together

Includes all materials and lunch both days

Instructors: Massey Burke and Sasha Rabin

For more information contact Sasha at sasha@sgnb.com, or www.sgnb.com

This two day workshop offers a hands-on introduction to working with clay, sand, and fibers to make beautiful, non-toxic plasters and finishes. These methods and materials can be used over conventional sheetrock as well as earthen and straw bale walls. We will process both unrefined and store-bought materials into plaster and paint, and we will apply these finishes over both earthen walls and sheetrock.

Participants will leave the workshop with enough understanding of the materials and process to mix and apply their own paints and plasters on a variety of substrates.

Sunday, July 26, 2009

Natural Building Workshop at the Villa


Another successful workshop here at the Villa has just come to a close. We had twelve amazingly wonderful people here for the last week taking part in a hands on natural building workshop, taught by Massey and myself (Sasha). We made great progress on three different small mostly earthen structures in our back yard. This workshop group was very dedicated and got the award for the the most on-time group ever. The group was diverse in origin with people originally from Venezuela, Greece, Czech Republic, Canada, and all throughout the US. Other than occasional smiling and nodding, we all (mostly) managed to communicate.
The workshop focused on earthen building, and we managed to cover an amazingly large array of techniques. In Sasha's pod we came close to finishing the cob, did the first layer of earthen plaster on the walls, and poured the first layer of earthen floor. In Massey's pod we started with some heavy straw clay, some simple bamboo, clay wattle, and a small strawbale wall topped with light straw clay. An earth bag foundation was done on Trilbys pod.

Saturday, July 4, 2009

NATURAL BUILDING WORKSHOP AT VILLA SOBRANTE

















July 20-25: Natural Building Intensive. Massey and Sasha are teaming up to teach a week long workshop that will be full of hands-on experience and information on different natural wall systems such as cob, strawbale, slip straw and wattle and daub, and will cover the process of building starting from design and site analysis, to alternative foundations and finishing touches.  Great for folks in building trades and those simply interested who want to gain more experience and knowledge. This course is being offered through the Solar Living Institute.  Contact Sasha (at) sgnb.com with questions and to sign up, or visit the SLI website:  www.solarliving.org/workshops.  Tuition:  $350.  Spread the word if you know of folks who might be interested!

Sunday, June 28, 2009

Rain Water Catchment System

Our rain water catchment tanks are now officially plumbed and ready for the rains (at least there is one thing that we are early with). Thanks to Ingrid, Nik Bertulis, and the wonderful workshop participants that attended yesterday's workshop, as well as Christina Bertea for her wonderful advice, the system is just about finished.

The five, five hundred and fifty gallon tanks are daisy chained together, the fir
st flush diverter is in, the secondary filtration system is installed, and it looks beautiful! All together the storage capacity is 2750 gallons. We still have to figure out details on the overflow, and readjust the gutters so water flows in the right directions. The system is designed to collect water from the north side of our house, which on a very low rain year should fill the tanks with a small amount left over. The tanks are mainly designed for landscaping and irrigation use, so they will fill during the winter, and be used during the summer. The overflow water will be incorporated in to the courtyard design, and more rain water catchment tanks will be built to catch the rain from the south side of the house. Stay tuned for updates on the ferocement water tank that will double as retaining wall. Thanks again to everyone who helped make this happen.


Thursday, April 16, 2009

Work parties and Visits with Inspectors



Life here at the Villa has been busy, apparently too busy for us to make time to post to our blog. Last weekend we had out first official work party, and it was a huge success. It deserves its own story, but the short update is that we have amazing friends who came and worked hard, and (I think) had a lot of fun. We got several garden beds dug, countless loads of manure brought in, and our first earthen wall built. The hybrid cob/adobe wall is on the street, delineating our parking from our garden. The reactions from the neighbors have been great, including people driving by, slamming on their breaks, and backing up to stare and look closer. 


The wall was built on Sunday, and on Tuesday we had our first building inspection for the foundation of the back unit. Our inspector turned out to be the supervisor named Tom. The first thing he said to us as he approached was "nice adobe wall". A good start. The foundation did not pass the inspection, and we were left with a list of things to do to fix it. The next day we got two inspectors, our regular guy named Joe, and another man. They were a bit more scrutinizing of the foundation and gave us yet another list of things to change. 

A while after they walked away we realized that they were standing on out driveway staring at the wall. Still without an inspectors stamp on our plans, and with two building inspectors staring at  our cob wall, our spirits were very low. Massey and I began the conversation of how easy it would be to disassemble the wall. As we were trying to decide whether to go talk to them or not, they started down the driveway towards us. With a bit of excitement in his voice Joe said, "How in the world did you get the idea of doing an Adobe wall?" Quickly realizing that they were not about to tell us it had to be removed, we talked for a bit about cob, adobe and earth bag building. 
The next part of the story is titled "how to get Massey and Sasha out of their really bad moods."  The next day Joe returned with yet another inspector. We thought perhaps we were so high maintenance with our never ending questions they needed two inspectors, but as it turns out they are just low on work they are taking the time to cross-train people from different departments.  After retying and moving seemingly endless wire and re bar (mostly Massey 
but with the help of all of us) in the most awkward positions under a house that you don't fit under in all places, we got the inspectors stamp of approval. As soon as the paper was signed, we started our bombardment of questions about out buildings, how to go about permitting experimental plaster, and wall height restrictions. Apparently the word had made it out about our wall, and despite the fact that it might not be totally legal, the supervisor from the first day had told them not to worry about it. So as Massey and I are talking about alternative methods with the building inspectors, one of them said to us, "this is very exciting, you guys are on the forefront of where everything is headed". We had to agree with that. We make our way to the front yard to again take a closer look at the wall, we show them a few books, and talk for about another half hour. 

The conversation ended with Joe saying he is going to see if he can arrange for us to give one of their weekly 1 1/2 hour seminars that all the inspectors have to sit through every Wednesday morning.   Apparently usually its someone from the industry, and fairly boring. We had to agree that our talk would be far more fun then listening to someone from Simpson talk about brackets. Joe proceeded to tell us how excited he is to watch the progression of the sheds in the back, and started his photo documentation by talking photos of the front wall and of the adobes drying in the back.

We didn't realize it at the time, but doing our first earthen project in the most prominent place was a really good idea. There is no possibility that we are trying to sneak something by anyone, and the conversations that have arisen from it have been fantastic.